Check all work of designers who work on assigned turn-around's.Lead designer for more than 15 major turn-around's.There were no field welds allowed in units therefore, was responsible for obtaining all field measurements needed to complete accurate piping drawings. Responsibilities also include Annotation and re-extracting of Isometric using PDS & MicroStation, checking ICR status & Isometric drawings against P&IDs & update master pipe line list per the partition folder, batching Isometric drawings, and updating & checking piping standards.Activities included Issue of Isometrics for Fabrication, communication & internal monitoring of Isometrics. As Spool Coordinator, responsible for all Isometric deliverables for the assigned Platforms B/D/E/F/RUP once the Design team has completed the Isometrics.Squad checking P&ID's, equipment drawings, and navigate thru Smart Plant Review.Prepared preliminary equipment drawings for vessel engineering review.Responsible for routing piping from the Sea Water Lift Pump to the Completion Work over Rig.Responsible for issuing isometric drawings using ICR system, and filing isometric drawings.Interfaced with process and mechanical engineer conducting design issues, communicated with other disciples to design a proper drawing.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |